Week 17 may have brought some rough weather here in Lincoln, but that hasn't slowed the masons down at all. They're just about finished filling in the brickwork, and after a bit of weathering it'll be hard to spot their work (which of course is the idea):

Up on third floor, the drywall is all up and the taping crew should be starting soon:

On second floor, insulating and drywalling is continuing:


Down on first floor, finish carpentry has begun on some of the new windows to make them blend in seamlessly with the beautiful old woodwork:

Down in the basement the plumbing is all in for the new bathroom, and the sand base means we should be seeing a new concrete floor soon: