As week four begins, electrical conduit work is almost complete:

Inside, asbestos removal of the pledge wing ceilings is finished:

On third floor, the bathroom is almost finished being demolished:


Removal of the old plaster walls and ceilings has begun on third floor as well:


In the basement, removal of the dividing walls between the various study spaces has begun:



Asbestos was also present in the chapter room ceiling, so that abatement work has begun:

The boiler room has been almost completely cleared of equipment and piping, making way for the new restroom occupying this space: