Week 30 finally brings a moment a lot of people have been waiting for - the gravel is gone, we have a paved back parking lot:


Our new door access controls are going in, which will be much improved over the old code system:

In the kitchen, the cabinetry for the kitchenette is installed:

And the first of the stainless steel is going in, the surround for the new serving opening:

In the house director suite, the cabinetry is installed:

While the main staircase is getting carpet, the other stairs have been getting new vinyl treads installed:

Finally, another major milestone was installation of the special Won-Door fire door to seal off second floor from the main staircase:
