Week 14 begins with progress in the basketball court. The new retaining walls have been formed up and are ready to be poured:

Inside, the masons have been busy patching openings and eliminating below-grade windows:


Upstairs, two things are holding up installation of the drywall. The first is installation of the fire sprinkler piping, which is progressing mainly on second floor right now:


The second is installation of the communications cabling, which has just begun:


Finally, the water piping installed so far is being pressure-tested to ensure there are no leaks before drywalling begins. Let's hope that 125 psi remains come Monday morning!